• ACCUEIL
  • À Propos de CCL
    • Vision et Mission
    • Comité de Direction
    • Implantation
    • Certificats/Conformité
    • Adhésion et Affiliations
  • Expertise
    • Dalles CCL
    • Précontrainte par Post-Tension
    • Préfabrication
    • Réparation et Reinforcement
    • Appareils d’appui
  • Structures
    • Bâtiments
    • Ouvrages d’art
    • Réservoirs et silos
    • Éoliennes
    • Stades
    • Dallages
  • Secteurs
    • Bureaux
    • Résidentiel
    • Santé
    • Education
    • Industriel
    • Commercial
    • Loisirs
    • Transport et Infrastructure
    • Environnement
    • Énergie et Services Publics
  • Téléchargements
    • Brochures
    • Articles
    • Vidéos
    • Études de Cas
  • Ressources Humaines
    • Témoignages
    • Offres d’emploi
  • Contact

Bridge No.502 Albertslund, Denmark

In 2006, inspection of bridge no. 502, in Albertslund, Denmark, identified structural degradation caused in part by high concentrations of chloride, particularly near to the abutments. In response to this, a programme of refurbishment was commissioned by Albertslund Council.

Significant damage had been caused at both ends of the bridge and the prestressed anchors were found to be corroded. Skandinavisk Spændbeton, part of the CCL group of companies, was commissioned to carry out replacement of the anchorages.

Following the removal of between one and two metres of concrete from each end of the bridge by the main contractor, Spændbeton carefully removed the existing anchors, the ducting and the grout before cleaning the wires.

After completing this operation, the company mounted a bespoke anchor, specially designed by Spændbeton, onto the wires and created anchorage studs on each, using a special jack. To allow the re-stressing of the wires to take place, they were then connected to 32-mm high-tensile bars which formed part of the retaining anchorage at the end of the bridge.

When the connections had been successfully completed, and the new concrete had gained sufficient strength, the high-tensile bars were stressed and grouted.

The work was carried out in two stages to ensure that access for traffic was maintained throughout the project.

 

  • Download Case Study
  • RETOUR
  • Albertslund Bridge

    Contact

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0) 113 270 1221
    E: enquiries@cclint.com

    Contact