• ACCUEIL
  • À Propos de CCL
    • Vision et Mission
    • Comité de Direction
    • Implantation
    • Certificats/Conformité
    • Adhésion et Affiliations
  • Expertise
    • Dalles CCL
    • Précontrainte par Post-Tension
    • Préfabrication
    • Réparation et Reinforcement
    • Appareils d’appui
  • Structures
    • Bâtiments
    • Ouvrages d’art
    • Réservoirs et silos
    • Éoliennes
    • Stades
    • Dallages
  • Secteurs
    • Bureaux
    • Résidentiel
    • Santé
    • Education
    • Industriel
    • Commercial
    • Loisirs
    • Transport et Infrastructure
    • Environnement
    • Énergie et Services Publics
  • Téléchargements
    • Brochures
    • Articles
    • Vidéos
    • Études de Cas
  • Ressources Humaines
    • Témoignages
    • Offres d’emploi
  • Contact

Costa Rica

Company Name
CCL SA

Primary Contact
Marija Trifunovic

Address
Edificio TISA
50 oeste de las oficinas de Pizza Hut
Pavas
Costa Rica
 

T: + (506) 2220 2001
E:  cclcostarica@cclint.com

Marija Trifunovic

Projects undertaken include:

Escazu Business Center, Escazu

Long spans achieved by CCL post-tensioned slabs were utilised on this project for the interior design of the building. The building is a 10-storey office tower located in Escazu. CCL completed post-tensioning of all slabs including the parking slabs and post-tensioned ramps to optimise space for 300 parking bays.

Hyde Park Nunciatura, Rohrmoser

Post-tensioned slabs were utilised to cope with the complex geometry on this residential project located on the eastern side of the Peru Park in Costa Rica. The building consists of 14 floors and two basements with a construction area of 11,000 m2 which has been transformed into 35 spacious apartments and two penthouses.

Santa Verde

Santa Verde is a planned community development which will offer commercial enterprises, offices and apartments in a green environment. A total area of 45,000 m2 has been built entirely with post-tensioned slabs. The project consists of three main buildings: Higuerón, Cedros and Verdería, in which CCL deployed teams to work simultaneously to complete all post-tensioned slabs within six months.

Contact

CCL
Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom

T: +44 (0) 113 270 1221
E: enquiries@cclint.com

Contact