• ACCUEIL
  • À Propos de CCL
    • Vision et Mission
    • Comité de Direction
    • Implantation
    • Certificats/Conformité
    • Adhésion et Affiliations
  • Expertise
    • Dalles CCL
    • Précontrainte par Post-Tension
    • Préfabrication
    • Réparation et Reinforcement
    • Appareils d’appui
  • Structures
    • Bâtiments
    • Ouvrages d’art
    • Réservoirs et silos
    • Éoliennes
    • Stades
    • Dallages
  • Secteurs
    • Bureaux
    • Résidentiel
    • Santé
    • Education
    • Industriel
    • Commercial
    • Loisirs
    • Transport et Infrastructure
    • Environnement
    • Énergie et Services Publics
  • Téléchargements
    • Brochures
    • Articles
    • Vidéos
    • Études de Cas
  • Ressources Humaines
    • Témoignages
    • Offres d’emploi
  • Contact

St Rafqa Basilica, Jrabta, Lebanon

Built on a mountainside at Jrabta in Lebanon, this imposing structure is designed to give the impression of a ship - its roof appearing to form a continuation of the surrounding hillside.

The challenging design of the roof, as a one-way slab resting on concave beams, included spans which averaged around 32m and a concave shape with variable sectional geometry. As a consequence, the weight of the beams would have proved to be problematic and would have yielded large flexural effects.

The CCL design team responded to these challenges with a series of innovative solutions. Voided sections allowed the reduction of beam self-weight while providing efficient inertia. Pot bearings were used at beam-column joints to act as a pinned connection without transferring any moment to the column, while temporary sliding bearings let the beams displace under post-tensioning, shrinkage and self-weight deformation. The locking of the bearing for the final stage secured the beams laterally.

The PT tendons were stressed prior to casting the slab, in order to maximise pre-compression in the beam, the sequencing of the post-tensioning within the beam itself. The other other beams helped to introduce the post-tensioning in a gradual manner. Displacement monitoring was carried out to allow validation of design equations in the case of complex slab geometry.

 

  • Download Case Study