• ACCUEIL
  • À Propos de CCL
    • Vision et Mission
    • Comité de Direction
    • Implantation
    • Certificats/Conformité
    • Adhésion et Affiliations
  • Expertise
    • Dalles CCL
    • Précontrainte par Post-Tension
    • Préfabrication
    • Réparation et Reinforcement
    • Appareils d’appui
  • Structures
    • Bâtiments
    • Ouvrages d’art
    • Réservoirs et silos
    • Éoliennes
    • Stades
    • Dallages
  • Secteurs
    • Bureaux
    • Résidentiel
    • Santé
    • Education
    • Industriel
    • Commercial
    • Loisirs
    • Transport et Infrastructure
    • Environnement
    • Énergie et Services Publics
  • Téléchargements
    • Brochures
    • Articles
    • Vidéos
    • Études de Cas
  • Ressources Humaines
    • Témoignages
    • Offres d’emploi
  • Contact

Tiara Hotel, Dubai, UAE

Tiara Hotel and Residences is a beachfront community located along the upper-right side of the trunk of the Palm Jumeirah.

CCL designed and installed the post-tensioning for the Tiara hotel in 2008 with the two hotel towers each having 22 floors and a total area of around 60,000 square meters.

In 2015, the client wanted to make some architectural changes to the building which would result in a change in loading. CCL was commissioned to check the feasibility of the changes in loading and what effect they would have on the post-tensioned slabs. New corings would also be required to allow installation of new MEP services.

CCL undertook a design check for new load acceptance and as a result designed, supplied and carried out the application of the required strengthening works CFRP and External Post-Tensioning.

The company also executed the slab corings making sure these were in the exact location where services were needed, while minimizing the numbers of tendons cut by the new corings.

 

  • Download Case Study
  • RETOUR
  • Contact

    CCL
    Unit 8 Millennium Drive
    Leeds
    LS11 5BP
    United Kingdom

    T: +44 (0) 113 270 1221
    E: enquiries@cclint.com

    Contact