The Marina of Casablanca is 24 hectares of grounds, designated for regeneration and improvement by the Moroccan government and the urban district of Casablanca.
The building was designed by architect Såd Benkirane and accommodates 60,000 m2 of offices. CCL was consulted at an early stage to provide an alternative post-tensioned solution for the structural consultants PYRAMIDE.
The solution accommodated the requirements and improved the design in terms of cost, by both removing the proposed drop beams and introducing a thinner slab.
The use of the CCL value engineering service at an early stage meant the project could be changed to a post-tensioned alternative without causing any delays or complications to the construction schedule.
CCL was selected by CDG Development (Caisse de dépôt et de gestion) to undertake the execution because of its ability to meet the tight deadlines on the project.
CCL provided local support to achieve the benefits detailed in the design. The integrated package of design, supply and installation through CCL’s local companies, provided the client with a quality solution from concept to completion.
CCL
Unit 8 Millennium Drive
Leeds
LS11 5BP
United Kingdom
T: +44 (0) 113 270 1221
E: enquiries@cclint.com
© CCL 2022 | Politique de confidentialité | Politique de cookies | Plan du site
Website design and build by Grey Matter | web design sheffield